PPMP 20009 Leading Lean Projects
PPMP20009 Leading Lean Projects
Assessment Specification Individual
Assessment (40%)
Length:
2500 – 3000 words (excluding references and appendix)
Case
study: Organizing a world class sporting event emphasizing on lean project
management.
General
Assessment Criteria
Incomprehensible submissions. Assessments provide the
opportunity for students to demonstrate
their knowledge and skills to achieve the required standard. To do this,
assessment responses need to be both clear and easy to understand. If not, the
University cannot determine that students have demonstrated their knowledge and
skills. Assessments will, therefore, be marked according to the marking
criteria (accompanied by the marking rubric). Failing to meet the requirements
may result in 0 (zero) marks where relevant.
Do not reproduce statements from PMBOK or PRINCE2 or any
other references without proper context.
Example
1:
Leadership is knowledge, skills, and
behavior required to guide, motivate and direct a team to achieve its business
goals (copied from page 56 of PMBOK), as this is considered plagiarism, instead
you must show how you would apply that statement to your case.
Example
2:
PMBOK version 6 constitutes 10
knowledge areas, 5 process groups and 49 process activities or
PRINCE2 consists of 7 Principles, 7 Themes and 7 Processes.
Produce your answers for the case in
question. DO NOT write about the theory or explain what PMBOK, PRINCE2, DMAIC
methodology, etc covers. That will not attract any marks. You should
demonstrate the application of the best practices not the theory.
Word count limit (excluding references and appendix). Your submission should be made using Microsoft WORD document of 2,500
- 3,000 words. Text length less than 2500 words will be penalized by 5% of the
total available marks while text beyond the 3000 word limit shall attract a
penalty as follows:
3001 - 3300 words: 5 marks
3301 - 3600 words: 10 marks
more than 3601 words: 15 marks
Academic language. All submissions should be thoroughly proof-read for
spelling, typographical or grammatical
errors before being submitted. Do not reply on the ‘spell-check’ function in
your word processing program. If, for example, ‘affect’ is substituted for ‘effect’,
your program may not detect the error.
Academic
Integrity
All assignments will be checked for
plagiarism (material copied from other students and/or material copied from
other sources) using Turn tin (TII). If you are found to have plagiarized
material or if you have used someone else’s words without appropriate referencing,
you will be penalized for plagiarism which could result in 0 (zero) marks for
the whole assignment. In some circumstances a more severe penalty may be
imposed. The link to the University’s Academic Misconduct Procedures is
available in the unit profile.
Introduction
You have been given a task to organise a prestigious world
class event. You may choose either:
the FIFA 2022 World Cup football
tournament to be held in Qatar (https://www.fifa.com/worldcup/qatar2022/)
or
the 2022 Commonwealth Games to be
held in Birmingham, UK https://www.birmingham2022.com
You may refer to the recently
concluded 2018 World Cup in Russia https://www.fifa.com/worldcup or the Gold Coast 2018
Commonwealth Games (https://gc2018.com/) as reference sites to organise these games.
Your tasks
This assessment item requires you to
work INDIVIDUALLY. As the project
manager in charge of delivering such as an important world sporting event, you are required to produce a REPORT to be submitted to the
organising committee.
Questions:
1. With regards to the event that you
have chosen to organise, identify and elaborate
a. The processes from PMBOK or Prince2
that you would use to help with the stakeholder management
b. The critical stakeholders for the
event
2. In
what ways would you have implemented lean project management for this event?
(You need to identify and elaborate the areas and opportunities where you can
eliminate waste).
3. Identify
and elaborate processes from PMBOK, PRINCE2, Organisational Project Management
(OPM), Agile Practices and Lean Six Sigma (DMAIC Methodology) that could be
used to implement lean project management.
Important
Information
Formatting. The report should be presented in 1.5 line spacing, 12 point
Times New Roman font. Report section
headings and numbering 1.0, 1.1.2 etc. is expected.
Supporting diagrams / figures may be presented in other formats -
Excel, PowerPoint slides, PDF
documents, as part of the appendix and will not count towards the essay’s word
limit. The reference list will also not be included in the word count.
Tables should
be placed in the report. It should be labelled correctly (Table 1, Table 2 etc) and shall be included in the word
count.
The submission should contain a
coherent, but necessarily restricted review of the academic literature on the
project management topics in question. The literature review should be
integrated into the essay, not a separate section. Do not include an executive
summary or an abstract.
This assessment item involves
researching your assigned topic to enhance your understanding of lean project
management concepts and utilisation of academic literature. Whilst you use the
recommended textbooks and lecture materials, you may also refer to relevant
peer reviewed, academic journal articles. A reference list (comprising between
5 – 10 references) formatted in the prescribed APA style is compulsory.
To get solution visit our website www.sourceessay.com
Comments
Post a Comment