Intregated Project Management
Assessment 1 Project Management
Processes and Life
Cycle Report
(2 parts, Individual / Group report)
• Part A: Module 2 Discussion activity: Change
requirement and Project life cycle
• Part B: Individual / Group report
Context:
Imagine
the voluminous processes which are needed to successfully complete a project.
As a project manager, you must see the big picture and coordinate the
integration of these processes throughout a project life cycle (PLC). You begin
by considering common elements to most projects. In addition, you reflect on
the process of integration by considering the steps necessary for beginning a
project. For good project management, it is not only necessary to work towards
a successful final project. Each phase of PLC must be designed, evaluated and
assessed based on specific project management approach. As a project manager,
you determine how project management process groups are incorporated into each
phase of project life cycle. These decisions might be based on the ultimate
goal and characteristics of the project, the stakeholders’ objectives or the
budget, among other elements.
Instructions:
In this
assessment, students are to work individually or in groups of 3-4 to complete a
project management report to Executive Management using PMBOK (PMI, 2013) as a
guide. Students assign project management roles and responsibilities to the
group members.
This assessment is divided into 2 parts.
Part A – Discussion activity: Change
requirement and Project life cycle
To begin
Assessment 1 Part A, students will be given a scenario based on approved
project. They will identify change requirements of the project and critically analyse
how the requirements introduce changes to the project management plan, process
groups and life cycle of the project. Students are encouraged to analyse the
case and share personal thoughts with group members in the class, and actively
seek feedback and inputs from facilitators. The individual and group should
organise discussion notes and upload it on the Blackboard accordingly.
Assessment 1 Part A is due by the end of Module 2.
Part B – Individual / Group Report
After the
proposed changes to the project management plan and the formulation of project
management processes and life cycle, students (individual or in group of 3-4
students) will elaborate and incorporate discussion outcomes from Assessment 1
Part A into a report. The report should be structured using an appropriate
business style / format with maximum of 3000 words. The key contents of the
report should include but not limited to: Change request analysis; Change
details in the project management processes and each stage of project life
cycle; Integrated change control; and justifications to the required changes
that occur.
Assessment 1 Part B individual/group final report is
to be submitted at the end of Module
3. For the group final report, each group must nominate a
group leader to upload the group final report on Blackboard. Only one
submission is required for each group.
To get solution visit our website www.sourceessay.com
Comments
Post a Comment