Information Systems Networking Essentials
THE SCENARIO
The Advanced Digital Computer Company is a new
company with its Headquarters building in the city, and with branches in
Parramatta, Hornsby and Sutherland. In addition there are two small home
offices in Bankstown and Epping. There are WAN connections between each site
and Head Office, with all Internet access through the Head Office site.
The Advanced Digital Computer Company is a
retail company for all types of computing devices. The company is planning a
restructuring of its network to allow for an expected 100% expansion over the
next 5 years. Whilst the numbers of sites are expected to remain the same, the
number of employees, and so end computing devices, is expected to double.
However, the server farm, currently 4 servers, is expected to be adequate for
the foreseeable future.
The Advanced Digital Computer Company has
consulted your group to provide a detailed Networking Plan. To assist you the
below diagram is supplied.
Advanced Digital
Computer Company Network Plan
You must design the network requirements for the
Advanced Digital Computer Company. As the network consultant you will be
required to develop a plan for the Company network, including all costs, for
all of the following:
1. The type of media you propose to use. This must
be adequate to allow for a 100% expansion of the Company network within 5
years, and must be sufficient for all bandwidth requirements for each Company
site. It should also be sufficient for increased bandwidth needs in the future.
Whilst the actual lengths of media chosen are not required, the cost of media
chosen should be included as a cost per meter price. You must justify your
choice of media. Remember this might include copper, fiber and wireless
options. The serial links between each site will be supplied by the company’s
ISP and are therefore not to be included in the above media requirements.
2. You are required to subnet the Company’s network
IPv4 Address using VLSM as appropriate. You will be required to provide summary
tables with IP Address ranges for all hosts in your network. When allocating
addresses you must allow enough addresses for the 100% expected future
expansion of hosts for the Advanced Digital Computer Company. As well, you need
to allocate one (1) printer for each 50 computers (or part thereof) on each
subnet. If there are, for example, 70 computers required on a subnet, then two
printers are required for that subnet. Printers will have the last usable
address/es for the subnet to which they belong. The servers will be located in
a separate subnet, and must be allocated static IPv4 Addresses within that
network. The number of servers is not expected to grow.
3. The ADC Company is anticipating a move to IPv6
in the future, and so needs to use a Dual Stack environment for IPv4 and IPv6
addresses. You are required to address the network for IPv6.
4. You must detail the hardware (ONLY switches,
routers) that the ADC Company will require. This must include full reasons for
selecting particular hardware, which must be adequate for the ADC Company’s
requirements. Again, consideration must be made with regard to future expansion
and bandwidth requirements. The details about computers, servers and printers are not required.
5. You must justify the type of network topology
you propose to use at each ADC Company location. A topology diagram for each
location should be included in your report.
6.
Communication
on the Internet is essential. Select and fully justify the type of Internet
access you propose to have for this Company. This must be scalable to allow for
future growth and needs. The Point of Presence (POP) is located at Head Office.
IPv4 Addressing
The Advanced Digital Computer Company has
purchased the IP Address (Given by your Instructor) from its ISP for addressing
all hosts within its network. Subnet, using VLSM, this IP Address to provide
addresses for all required hosts. This addressing scheme should allow for the
100% expected growth. Complete the table below.
IPv6 Addressing
The Advanced Digital Computer Company has
purchased the IPv6 Address (Given by your Instructor) from its ISP for
addressing all hosts within its network. Subnet, using VLSM, this IP Address to
provide addresses for all required hosts. This addressing scheme should allow
for the 100% expected growth. Complete the table below.
Additional Information
1. Apart from the IP Addresses, you are not required to supply any WAN link
information. This included serial cables, VPN connections, or any security
issues relating to those links.
2.
Head Office employees are in three separate
networks as follows:
a. Sales
60 Hosts
b.
Marketing 35 hosts
c.
Accounts 30 Hosts
3. There will be a Server Network, with 4 Servers,
for the entire Company. This will be situated in a separate LAN in the Head
Office building. It is expected that the 4 servers will be sufficient for the
next 5 years, and so will not be subject to the 100% growth requirement.
4. All branch offices and Home Offices can be
considered an extension of the Head Office network, and so the IP Addresses
allocated must be reflected in the overall addressing scheme for the company.
The only media requirements required are those internal for each site.
5. Hardware (such as routers and switches) should
reflect expected usage. Therefore, low usage environments such as those for the
Home Offices, would require different hardware than high usage areas, such as
those of the Head Office.
6. Internet Access for the entire company, the
Point of Presence (POP), is through the Head Office. This connection should be
sufficient for all current users, and scalable to allow for the expected
increase over the next 5 years.
GENERAL REQUIREMENTS
This assignment is to be done in a group. Much
of the work can be based on research carried out on the Internet. All
information obtained must be fully
referenced using the referencing method, as per the subject outline.
The assignment is due on Friday (01/02/19). Late
assignments will incur a penalty of 5% per day, as per the subject outline.
This case study will assess all objectives from the course outline.
There is no minimum mark required for this
Assignment. Students who fail to attain 50% for it will need to work harder in
other assessment items to make up the deficit.
The Case
Study must have a title page with the following information: Course Name – Information Systems Networking Essentials Course Number – ISY202/ISY2002
Case
Study Title – Assignment 1
Case
Study due date – Week 10, 1st February 2019 Word Count – 2000 - 2500
DO NOT
include copies of referenced material or other
documents (such as pamphlets) with
this assignment. However, proper referencing of all sources is essential.
Referencing should follow the style as per the subject outline.
ASSESSMENT Criteria
This
Assignment is marked out of 100 marks and is worth 20 percent (20%) of the
overall assessment. The length of the report for this case study should be a
maximum of 2500 words. Diagrams, tables and figures can be an addition to this
length. Text should be formatting as 10pt/11pt A4 with double line spacing or
12pt with single line spacing. Remember, this assignment will be written as a
report. Marks for this assignment will be allocated as follows:
Executive Summary ( /5 marks)
Concise nature of the summary
Inclusion of essential points from the report
document Any conclusions clearly stated
Quality
of the Report ( /80 marks) You must include the following in the written
report:
1. The document’s
inclusions (…./25)
Proper definitions of the technical terms High
level of detail
Problems/issues clearly identified
Good discussions on the topic (pros/cons, future perspectives.)
Clear and Precise Diagrams
Acronyms explained
Note:
Definitions and acronyms should be included in the body of the report when
first used. DO NOT ADD them as a table at the end of the Case Study document.
2. Subnetting (…../10)
3. Logical
structure (…../45 detailed below) Introduction that details
Context and topic well introduced ( /5) * (See Note 2 below)
Logical structure of the report ( /5) * (See Note 3 below)
The body
of the report that logically follows the introduction, with alternatives and
recommendations, as well as justified reasons for conclusions reached.
( /20)
The conclusion that provides
o
Good short summary of what has been written in
the body. ( /10)
o Presentation of your vision for the future based
on the conclusions reached.( /5)
Correct referencing of information ( /10 marks)
Correctly using the Harvard system.(/5)
Quality of Reference Material. ( /5)
Correct formatting of the report ( /5 marks)
Using 10pt/11pt A4 with double line spacing or
12pt with single line spacing.
Note 1:
Students who exceed the word limit will be
penalised 10% for every 250 words in excess of the 2500 permitted.
Note 2:
Context
and topic well introduced:
For this section, your group will need to make some assumptions and
document these. The assumptions should include:
1.
The philosophy of the ADC Company.
2.
A statement indicating the expected requirements
for the ADC Company’s Network.
3. The ADC Company’s Network requirements as your
group sees them – Do not simply re-state the requirements written in
this Case Study document as these will receive zero marks.
4. Using the information you make in items 1, 2
& 3 above, you should have a basis for the needs of the company that you
will develop in the body of the report.
Note 3:
Logical Structure of the report: After reading this section, the reader (and
marker of your Case Study) should have a clear understanding of the
written content in the body of your report.
Copying another student’s work is prohibited.
Duplicate material will result in zero marks for all students involved. Information on proper practice in
assessments is available on the web site referred to in the subject outline.
To get solution visit our website www.sourceessay.com
Comments
Post a Comment