Integrated Project Management
Assessment: Assessment 1:
Project Management Processes and Life
Cycle Report (2 parts, Individual / Group
report)
Part A: Module 2 Discussion:Change&Project life cycle
Part B: Individual / Group report
Context:
Imagine
the voluminous processes which are needed to successfully complete a project.
As a project manager, you must see the big picture and coordinate the
integration of these processes throughout a project life cycle (PLC). You begin
by considering common elements to most projects. In addition, you reflect on
the process of integration by considering the steps necessary for beginning a
project. For good project management, it is not only necessary to work towards
a successful final project. Each phase of PLC must be designed, evaluated and
assessed based on specific project management approach. As a project manager,
you determine how project management process groups are incorporated into each
phase of project life cycle. These decisions might be based on the ultimate
goal and characteristics of the project, the stakeholders’ objectives or the
budget, among other elements.
Instructions:
In
this assessment, students are to work individually or in groups of 3-4 to
complete a project management report to Executive Management using PMBOK (PMI,
2013) as a guide. Students assign project management roles and responsibilities
to the group members.
This assessment is divided into 2 parts.
Part A – Discussion
activity: Change requirement and Project life cycle
To
begin Assessment 1 Part A, students will be given a scenario based on approved
project. They will identify change requirements of the project and critically analyse
how the requirements introduce changes to the project management plan, process
groups and life cycle of the project. Students are encouraged to analyse the
case and share personal thoughts with group members in the class, and actively
seek feedback and inputs from facilitators. The individual and group should
organise discussion notes and upload it on the Blackboard accordingly.
Assessment 1 Part A is due by the end of
Module 2.
Part B – Individual /
Group Report
After
the proposed changes to the project management plan and the formulation of
project management processes and life cycle, students (individual or in group
of 3-4 students) will elaborate and incorporate discussion outcomes from
Assessment 1 Part A into a report. The report should be structured using an
appropriate business style / format with maximum of 3000 words. The key
contents of the report should include but not limited to: Change request
analysis; Change details in the project management processes and each stage of
project life cycle; Integrated change control; and justifications to the
required changes that occur.
Assessment 1 Part B individual/group
final report is to be submitted at the end of Module
3.
For
the group final report, each group must nominate a group leader to upload the
group final report on Blackboard. Only one submission is required for each
group.
Note:
Participation and contribution to discussion forums consist of one original
post and at least one response/feedback/critique to a peer’s posting. Your
learning facilitator will also provide to individual student’s summative
feedback on the postings to prepare students for their assessment submission.
To get solution visit our website www.sourceessay.com
Comments
Post a Comment